CONCRETE
Flatwork and footings.
Slabs, driveways, walkways, patios, and the footings everything else is laid on. Formed, poured, and finished level.


Brick first. Block, stone and concrete where the job calls for them.
WALL SECTION
BRICK course
Flatwork and footings.
Slabs, driveways, walkways, patios, and the footings everything else is laid on. Formed, poured, and finished level.

Structure below the finish.
Footings, foundation courses, retaining walls and structural block. The part of the job that gets covered up and has to be right.

The primary trade.
Veneer, columns, mailboxes, knee walls, arches and elevations. Laid to a line, jointed consistently, capped square.
LEADS THE WORK

Veneer and set pieces.
Stone veneer, pillars, caps and plaque settings. Fitted and pointed by hand.

Structures that live outside.
Patios, knee walls, planters and raised beds. Built in the same materials as the house they sit beside.

One-offs and detail work.
Arches, inset patterns, limewash finishes and anything drawn rather than ordered.

If it is masonry or concrete, ask. The estimate is free either way.